– This was a mini-load system installed in an existing building which presented many different issues. The existing thin concrete slab was overcome with alternative floor anchorage. We had to invent new erection and plumb procedures to ensure proper integration with the building.
– Our unique resolution to their problems allowed them to gain over 53,000 loads in overall capacity and still saved them more money than traditional racking solutions. Sixty percent of the loads were installed within a 2 millimeter tolerance of design.