Federal Reserve Bank

Seattle, WA

– This job was a challenge due to the seismic requirements increased by a multiple of 4 and the fact that was installed inside an 18” thick concrete vault. Our solutions extended beyond the scope of the rack, and by changing how the building was constructed, saved the owner over $250,000, in both concrete work and steel. Also, because we worked hand in hand with the owner from the project onset, we were able to complete the rack four months ahead of schedule.